REMODELACIÓN DEL ESTADIO DEL FÚTBOL CLUB BARCELONA 2007_OAB. OFFICE OF ARCHITECTURE IN BARCELONA + SANTI VIVES + ARUP SPORT







Remodelación del Estadio del Fútbol Club Barcelona
OAB. Office of Architecture in Barcelona + SANTI VIVES + ARUP SPORT
Barcelona, España




Date: 2007 – 2007
City: Barcelona
Country: Spain
Architects: OAB. Carlos Ferrater (Borja Ferrater), S.V.C & S.V. & A.V. (Enric Serra, Lluis Vives, Jordi Cartagena), ARUP SPORT (J.Parrish, Martin Simpson)
Photographers: Aleix Bagué

Seleccionado Segunda Fase des Concurso Supervisado por el COAC.
Segundo Clasificado.









La propuesta de Ferrater pretendía que el club pudiese ofrecer a la ciudad un "edificio emblemático y singular, de un gran rigor técnico y  constructivo", y que la gente sintiera próximo, pero inconfundible
El proyecto preveía conservar la estructura del campo actual, derribando las partes más obsoletas, dibujando en planta una forma de elipse y en sección un perfil ligeramente ondulado. A partir de esta forma ondulada y elíptica, el estadio habría formado un gran vaso depositado en el suelo por medio de un ritmo vertical de vacío preciso y lleno que sugería la imagen de una copa que  el Barça ofrece a la ciudad.


La nueva cubierta estaba formada por una "imaginativa estructura de cables entrecruzados que alcanzaban la máxima sección a dos tercios de la luz máxima".
Un ordenado, profundo y potente ritmo vertical de elementos estructurales cubría todo el perímetro del nuevo edificio, dispuesto siguiendo los ejes de la obra del arquitecto Mitjans en forma de peristilo, lo que daría al estadio su inconfundible imagen.


Para facilitar la entrada del sol y la ventilación del campo, el último tercio de la nueva cubierta era de material translúcido y retráctil. Este proyecto entendía el Camp Nou como un icono de ciudad y lo reimagina. Eso sí, la idea se adecuaba a la tendencia creciente de recubrir la arena en función de las nuevas exigencias del deporte profesional y de la industria del fútbol. Este cambio incidía en la exteriorización del campo y en los 
nuevos usos que se tenían que dar al interior.


Presupuesto: 245 millones de euros.




Our project is a stadium of a new generation not only on account of the technical solutions but due to the socio-urban affirmation that it represents: a Barcelona leisure infrastructure with continuously functioning services that go way beyond sporting events. The challenge we set ourselves is to resolve a heterogeneous program in an ordered and clear framework. Our objective is for the Club to offer the city an emblematic, exceptional building, for the citizenry to feel that the new stadium is close and accessible, at the same time as its identity is unmistakable.


The idea of remodeling Barcelona FC’s stadium proceeds from maintaining the essential elements of the structure of the building that the architect Francesc Mitjans designed in 1957 as an original nucleus of the new project. Demolition of the more obsolete parts of the current stadium will permit the construction of a new seating tier, which, keeping to the layout of the original tiers, will complete the elegant interior bowl.


In order to have better visibility of the pitch it is necessary to concentrate the greatest number of seats in the bands parallel to its main axes and to reduce the number of seats at either end of the rectangle of play. This solution describes an elliptical shape in plan and a lightly undulating profile in section.

Designed on the basis of a sophisticated geometry, the roof will be resolved by means of the construction of a structure of intercrossing cables that reach their maximum section at two-thirds of the maximum span and which, meanwhile, are reduced towards the ends until arriving at a delicate slenderness. This is a system of easy and rapid execution, ideal for the circumstances of this project.  In order to facilitate the ventilation and insolation of the playing field, the final third of the roof will be of a translucent, retractable material. Given that the new structural system has to be independent of the original system of the Mitjans stadium, we will need to have a new structural perimeter in order to stabilize the new construction. The external part of the structure of the new stadium will therefore create the new image of the building.


An ordered, profound and potent vertical rhythm of structural elements will cover the whole perimeter of the building, these elements being arranged according to the structural axes of the Mitjans opus as a peristyle, thus giving the stadium its unmistakable look.


The stadium pays attention to the requirements of the Mediterranean climatology (it harnesses the light and generates shadow). The vertical rhythm of voids and solids also provides an open and permeable relationship with the city, giving depth and transparency at the same time as it is constituted as a potent element of solar and light control for the ancillary structures of the inside of the stadium.


We propose a system of LED screens adhering to each of these spaces and also in the gaps between them, which will enable the huge symbols, slogans and messages the Club wishes to broadcast to be emitted. The facade will be a huge surface of communication, identity and conviviality. The new stadium would only constitute a Barcelona icon were it able to be the reflection of high technology and constructional rigor, in line with Catalan architectural tradition.










 © ALEJO BAGUÉ

 © OAB

 © OAB

 © OAB

  © OAB

  © OAB

 © OAB

web OAB: http://www.ferrater.com/

web ARQUITECTURA SANTI VIVES BARCELONA: 
http://www.santivives.com/

web ARUP: http://www.arup.com/


No hay comentarios:

Publicar un comentario

Para poder comentar es necesario que cuentes con una cuenta Google, ya que esto implica que de antemano has aceptado la gestión de tus datos personales por parte de Google LLC, propietario de Blogger. En este caso, el envío del comentario es una aceptación explícita e inequívoca de la gestión tanto de tus datos como del comentario mismo para uso de AIB Architecture. La finalidad de la recogida de los datos, además de permitir mostrar tu comentario, es para poder responderte por este medio. Consulta más información en Aviso Legal y Política de Privacidad.